Home
Brands
RENAULT
SAFRANE I (B54_)
Used Car Parts Catalog
Interior
Front left interior door handle
Your car
RENAULT SAFRANE I (B54_)
Parts
Airbags
45
Body Parts
633
Electrical and Electronic
267
Interior
359
Lights
427
Engine & Transmission
292
Not identified
38
Sets
1
Suspension
58
30kg+
Read more about
CO₂
savings
Reference
-
8 Results
Recommended
Price () Ascending
Price () Descending
New
Fast delivery
24
BP13382731I13
Front left interior door handle
RENAULT
SAFRANE I (B54_)
2.0 (B540) (105 hp)
[1992-1996]
7700816564
5
-
-
$ 67.45
Shipping included
in price, VAT included,
if not exempt
.
4 to 6 working days
3
BP3736057I13
Front left interior door handle
RENAULT
SAFRANE I (B54_)
2.2 (B541) (107 hp)
[1992-1996]
5
-
-
$ 87.39
Shipping included
in price, VAT included,
if not exempt
.
4 to 6 working days
4
BP3782957I13
Front left interior door handle
RENAULT
SAFRANE I (B54_)
3.0 V6 (B54B, B544) (167 hp)
[1992-1996]
5
-
-
$ 87.39
Shipping included
in price, VAT included,
if not exempt
.
4 to 6 working days
2
BP20889709I13
Front left interior door handle
RENAULT
SAFRANE I (B54_)
2.1 dT (B546) (88 hp)
[1993-1996]
7700816564
5
J8S 760
227127
$ 104.98
Shipping included
in price, VAT included,
if not exempt
.
5 to 7 working days
2
BP22030434I13
Front left interior door handle
RENAULT
SAFRANE I (B54_)
2.2 (B543) (137 hp)
[1992-1996]
-
228395
$ 109.68
Shipping included
in price, VAT included,
if not exempt
.
5 to 7 working days
8
BP27391098I13
Front left interior door handle
RENAULT
SAFRANE I (B54_)
2.2 (B543) (137 hp)
[1992-1996]
7700816564
5
-
63231
$ 116.71
Shipping included
in price, VAT included,
if not exempt
.
5 to 7 working days
2
BP25091580I13
Front left interior door handle
RENAULT
SAFRANE I (B54_)
2.0 (B540) (105 hp)
[1992-1996]
7700816564
5
-
-
$ 117.89
Shipping included
in price, VAT included,
if not exempt
.
6 to 8 working days
22
BP22100336I13
Front left interior door handle
RENAULT
SAFRANE I (B54_)
2.5 dT (B548) (113 hp)
[1992-1996]
5
-
205678
$ 119.06
Shipping included
in price, VAT included,
if not exempt
.
6 to 8 working days
30kg+
Read more about
CO₂
savings